Case Study





ST. MICHAEL’S CENTRE, CLIFFERNA, STRADONE
LED LIGHTING UPGRADE

Clifferna Hall 1 cropped.png

 

THE SITUATION

St. Michael’s Centre is a community run centre where members of the community tend to gather for group activities, social support, public information and other purposes. 
We play a big involvement in The Cavan SEC Community and together we approached the committee of St. Michael’s Centre about the scheme and what there was to offer them.
The Cavan SEC Community was able to secure a Better Energy Community Grant of 30% for this project which would consist of the replacement of all the old inefficient lighting fixtures to new LED Lighting fixtures and for the full centre to be fully insulated.

 

THE EXPECTATION

 

  • Saving Energy
  • Creating a warmer brighter environment for all members of the community
  • Enhance the appearance of the community centre

 

PRODUCTS

Urbano LED Lighting fixtures:
http://kellihers.com/wp-content/uploads/2018/02/urbano-led-19000lm.png
BS 100 LED Ceiling Light
http://kellihers.com/wp-content/uploads/2018/07/s-l300.png
Portland 2D

http://kellihers.com/wp-content/uploads/2018/02/s_products159aB.png

 

 

Clifferna Hall 4.png

 

THE SOLUTION

The old inefficient lighting fixtures were replaced with new efficient LED Lighting fixtures in the main hall, the ladies toilets, the gent toilets and the kitchen and outside.

 

Clifferna Hall 8.png

 

BENEFITS

The LED lighting will reduce St. Michael’s Centres lighting bills by 60% per annum and require virtually no maintenance for up to 10 years.

Clifferna Hall 10.png

 

 

THE PROJECT

 

Current Wattage:                         1926.00
Proposed Wattage:                      787.00
Annual Energy Savings (kWh)      2367.00

 

 

 

“We were delighted to work along with The Cavan SEC Community on this project and be able to help this community upgrade the lighting in this wonderful facility that they have. The new LED Lighting will not only reduce energy consumption and lower utility expenses but will also minimize maintenance and operational costs for the community,.” Micheal Smith – M&C Hybrid Energy Ltd.

 

 

 

 

Clifferna Hall 12.png

 

Clifferna Hall 14.png

Clifferna Hall 16.png

 

Clifferna Hall 17.png

 

The job was completed by M&C Hybrid Energy Ltd
And Breffni Insulation
On behalf of The Cavan SEC Community